Final check

The Final Check confirms that a system is operating in accordance with its specification and in the correct position and function. The Final Check includes, for example, the improved positioning and displacement of fastening components on the robot or the adjustment of the optimum component length on the tool on axis 6 and at the interface on axis 3. A Final Check is required for the validation of the statutory country-specific warranty scopes and is part of the range of services for energy supply to the robot.

A     B     C     D     E     F     G     H     I     J     K     L     M     N     O     P     Q     R     S     T     U     V     W     X     Y     Z

Contact
This site uses cookies in order to improve your user experience and to provide content tailored specifically to your interests. Detailed information on the use of cookies on this website is provided in our Privacy Policy. By using this website, you consent to the use of cookies.